首页> 美国政府科技报告 >Post waterflood CO(sub 2) miscible flood in light oil, fluvial-dominated deltaic reservoir. Annual report, October 1, 1993--September 30, 1994
【24h】

Post waterflood CO(sub 2) miscible flood in light oil, fluvial-dominated deltaic reservoir. Annual report, October 1, 1993--September 30, 1994

机译:后水驱CO(sub 2)可混溶的轻油,河流为主的三角洲储层。年度报告,1993年10月1日至1994年9月30日

获取原文

摘要

Texaco Exploration and Production Inc. (TEPI) and the U.S. Department of Energy (DOE) entered into a cost sharing cooperative agreement to conduct an Enhanced Oil Recovery demonstration project at Port Neches. The field is located in Orange County near Beaumont, Texas. The project will demonstrate the effectiveness of the CO(sub 2), miscible process in Fluvial Dominated Deltaic reservoirs. It will also evaluate the use of horizontal CO(sub 2) injection wells to improve the overall sweep efficiency. A data base of FDD reservoirs for the gulf coast region will be developed by LSU, using a screening model developed by Texaco Research Center in Houston. Finally, the results and the information gained from this project will be disseminated throughout the oil industry via a series of SPE papers and industry open forums. Reservoir characterization efforts for the Marginulina sand, are in progress utilizing conventional and advanced technologies including 3-D seismic. Sidewall and conventional. cores were cut and analyzed, lab tests were conducted on reservoir fluids, reservoir BHP pressure and reservoir voidage were monitored as shown. Texaco is utilizing the above data to develop a Stratamodel to best describe and characterize the reservoir and to use it as an input for the compositional simulator. The current compositional model is being revised to integrate the new data from the 3-D seismic and field performance under CO(sub 2) injection, to ultimately develop an accurate economic model. All facilities work has been completed and placed in service including the CO(sub 2) pipeline and metering equipment, CO(sub 2) injection and production equipment, water injection equipment, well work and injection/production lines. The horizontal injection well was drilled and completed on January 15, 1994. CO(sub 2) purchases from Cardox continue at an average rate of 3600 MCFD. The CO(sub 2) is being injected at line pressure of 1350 psi.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号