Evaluation/disposition of observations no. 6-17, 6-18, and 6-22 from site electrical assessment report, 300 area powerhouse and emergency sys

机译:评估/处置观察没有。现场电气评估报告,300区域厂房和应急系统6-17,6-18和6-22

获取原文

摘要

Disposition of Observations 6-17, 6-18, 6-22 of Site Electrical Assessment Report. Application of generator differential protection, and synchro-check relay rewiring for generators of building 3621-D. In 1990, the WHC Site Electrical Task Group issued a Site Electrical Assessment Report, ''300 Area Powerhouse and Emergency System.'' This report included numerous findings and observations relating to observed deficiencies or opportunities for improvement in maintenance of the inspected electrical systems. The purpose of this letter report is to provide an evaluation and proposed disposition of Observations No. 6-1 7, 6-1 8, and 6-22 of the Site Electrical Assessment Report.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号