首页> 美国政府科技报告 >High Volume--High Volume Usage of Flue Gas Desulfurization (FGD) By-Products in Underground Mines. Quarterly report, July 1-September 31, 1996
【24h】

High Volume--High Volume Usage of Flue Gas Desulfurization (FGD) By-Products in Underground Mines. Quarterly report, July 1-September 31, 1996

机译:大批量 - 地下矿井烟气脱硫(FGD)副产品的大批量使用。季度报告,1996年7月1日至9月31日

获取原文

摘要

The focus of activity for this quarter was the final selection and preparation of a mine site for the grout emplacement field demonstration. The site chosen is located in Floyd County, Kentucky and is owned by the Sunny Ridge Mining Company. Specifically, a northeast-trending highwall was selected that contains numerous auger holes of 31 inch diameter and varying depth. The coal has been deep- mined beyond the auger holes thus limiting their length. Access to the site is good, and the overlying strata are relatively un- weathered and competent. Preparation of the site involved culling a road to the highwall, followed by uncovering the auger holes which had previously been partially filled and graded with rock. The auger holes were then extensively characterized in the context of overall dimensions, condition, and extent of communication between holes. For this portion of the work, several types of apparatus were obtained, and constructed. Selection of a grout emplacement method was also completed. It was decided that concrete trucks will transport the dry FBC flyash to the site whereupon a specified amount of water will be added. This grout will then be transferred to a concrete pumping truck that will be used to inject the material into the auger holes. In this quarter, the arrangements necessary to complete the emplacement have been made.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号