首页> 美国政府科技报告 >Statement of Work for Direct Push Technology Characterization Borehole Installations During Fiscal Year 2006, 300-FF-5 Operable Unit
【24h】

Statement of Work for Direct Push Technology Characterization Borehole Installations During Fiscal Year 2006, 300-FF-5 Operable Unit

机译:在2006财年,300-FF-5可操作单元的直接推动技术表征钻孔装置的工作说明

获取原文

摘要

Pacific Northwest National Laboratory, the U.S. Department of Energy (DOE), and the U.S. Environmental Protection Agency (EPA) have agreed that temporary characterization boreholes shall be installed in the 300-FF-5 Operable Unit to collect borehole radiological (spectral gamma) data. These characterization boreholes are also documented in the 300-FF-5 Limited Field Investigation Plan. This document contains the statement of work required to install, characterize, and decommission the proposed temporary boreholes during fiscal year (FY) 2006.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号