首页> 美国政府科技报告 >Estimates of Costs of Conventional Coal Fired Steam Production Plants.
【24h】

Estimates of Costs of Conventional Coal Fired Steam Production Plants.

机译:常规燃煤蒸汽生产装置成本估算。

获取原文

摘要

The costs of steam supply plants using stoker and pulverized coal firing was estimated. Conceptual designs have been prepared for each combustion system for plants with one and four 250,000 pound per hour boilers producing steam at 650 psig and 750 F. The capital costs of these plants are very dependent on the site, application, and type of coal selected. Capital costs of about $50 to $55 per pound per hour of capacity can be expected for single unit plants. Four unit plants cost less, approximately $35 to $45 per pound per hour, because of the many systems which are common to all boilers. Operations and maintenance costs, excluding coal, were also prepared. These also can vary widely, depending on the specific plant application. For this estimate, it was assumed that the steam plant would be staffed independently of adjacent process facilities. (ERA citation 03:008859)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号