首页> 美国政府科技报告 >Study of Proposed Interconnection Between the City of Lubbock, Texas and Southwestern Public Service Company. Staff Report
【24h】

Study of Proposed Interconnection Between the City of Lubbock, Texas and Southwestern Public Service Company. Staff Report

机译:德克萨斯州拉伯克市与西南公共服务公司建议互连的研究。员工报告

获取原文

摘要

The city of Lubbock, Texas currently meets its power demand by local, isolated power generating units with a dependable capacity of 125 MW. Annual power needs for Lubbock to the year 1992 are forecast, and the economic and technical advantages of interconnecting the city with the Southwest Public Services 230 kV power system are discussed. (ERA citation 03:023688)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号