首页> 美国政府科技报告 >Measurement of Polyethylene Pipe Parameters During an Ocean Deployment. Final Report
【24h】

Measurement of Polyethylene Pipe Parameters During an Ocean Deployment. Final Report

机译:海洋部署过程中聚乙烯管道参数的测量。总结报告

获取原文

摘要

Data were acquired on the behavior of the polyethylene upwelling pipe for the GRI/DOE Marine Biomass Biological Test Farm during several phases of pipe assembly and ocean towing and deployment. The pipe is nominally 28 in O.D., 1400 feet long with wall thicknesses of 0.9 and 1.75 inches. The entire effort was conducted over a period of six weeks and was implemented on a strictly non-interference basis with the main Biomass Program. Three types of data were acquired during shore and ocean based operations conducted in the southern California area during the period from 15 September-27 September 1978. Axial strain data were obtained from two rows of 15 transducers each, separated circumferentially by 90 exp 0 and distributed along the entire length of the pipe. Photographic data were also acquired from helicopter, boat and shore stationed cameras. The third type of data acquired were lowering line tension measurements made during the second successful deployment operation. (ERA citation 05:028672)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号