Environmental Monitoring During Constructîon of the Miamisburg Solar and Fishing Ponds

机译:迈阿密斯堡太阳能和钓鱼池塘建设期间的环境监测

获取原文

摘要

This study was an integral part of the Solar Pond construction activities in the Miamisburg Community Park. It provides reassurance that there was no significant risk to the health and safety of the construction workers, or to park visitors, from potential radiation exposures.nShort-term (8-hr) and long-term (168-hr) air samples were collected and analyzed for plutonium-2 38, plutonium-239, and total suspended particulates. The short-term sampling was conducted only during periods of construction activity in the pond area. The long-term monitoring, however, had been and continues to be a part of Mound's normal environmental monitoring program, and is conducted on a continuous 24-hr/day, 7-day/week basis.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号