Synthesis Gas Demonstration Plant Program, Phase I. Deliverable No. 7D: Final Report on Pilot Plant Sustained Run

机译:合成气示范工厂计划,第一阶段。可交付的第7D号:试验工厂持续运行的最终报告

获取原文

摘要

The object of the Type Ic, Extended Pilot Plant Run, was to establish equilibrium conditions in all streams, obtain analytical data from all streams, obtain slag and char physical properties, demonstrate sustained operation with the design coal and confirm the design basis. Based on our initial review of the data obtained from the extended run, the objectives of the run have been met. The extended run confirmed the design parameters used in the Demonstration Plant design with regard to Synthesis Gas composition and quantity, waste streams, and the required coal and oxygen inputs. The Texaco Type Ic Test Report included in this report tabulates this information. The design of the Demonstration Plant was essentially completed before the Type Ic extended test run. As stated, the extended test generally confirmed the validity of the Demonstration Plant design. However, certain factors emerged during the test run that suggest that certain aspects of the Demonstration Plant design should receive particular attention during Phase II of the Demonstration Plant Program. These are listed and described. (ERA citation 05:030072)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号