Hardware Implementation and Test Results of PEP Chopper Magnet Power Supply System

机译:pEp斩波磁铁供电系统的硬件实现和测试结果

获取原文

摘要

Emphasis is placed on the hardware that has been produced and any changes that have occurred in the major technical components. At the time of the conference all of the Injection and Beam transport system is installed and beam has been run down the South Injection tunnel two-thirds of the way to the ring. The chopper system for powering the Ring Bend, Quadrupole, and Sextupole circuits is prepared for installation when the region 8 surface building is available for occupancy in early April, 1979. The last major system, the bipolar Trim and Steering supply system is partially completed and orders for the remainder are now being placed for delivery in June, 1979. The following sections will describe each of the systems in more detail. (ERA citation 04:043672)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号