首页> 美国政府科技报告 >Transient Response of Babcock and Wilcox-Designed Reactors
【24h】

Transient Response of Babcock and Wilcox-Designed Reactors

机译:Babcock和Wilcox设计的反应器的瞬态响应

获取原文

摘要

On February 26, 1980, the Crystal River Unit No. 3 Nuclear Generating Plant, designed by the Babcock and Wilcox Company (B and W), experienced an incident involving a malfunction in an instrumentation and control system power supply. Faced with the Crystal River Unit 3 incident and the apparently high frequency of such near similar types of transients in other B and W designed plants, a special Task Force was established within the Office of Nuclear Reactor Regulation to provide an assessment of the apparent sensitivity of the B and W designed plants to such transients and the consequences of malfunctions and failures of the integrated control system and non-nuclear instrumentation. This report provides an assessment of these issues.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号