Engineer, Design, Construct, Test, and Evaluate a Pressurized Fluidized-Bed Pilot Plant Using High-Sulfur Coal for Production of Electric Power. Phase III: Pilot-Plant Construction. Quarterly Report, June 1-August 31, 1980

机译:工程师,设计,建造,测试和评估使用高硫煤生产电力的加压流化床试验工厂。第三阶段:试验工厂建设。 1980年6月1日至8月31日的季度报告

获取原文

摘要

Technical progress during the period June 1 through August 31, 1980 included the following activities: The PSD permit approval was obtained from the US Environmental Protection Agency. The building permit was obtained from the Borough of Wood-Ridge. Installation designs incorporating modifications to the Total Energy System, Gas Turbine, Free Power Turbine and Waste Heat Boiler are in an advanced stage. Procurement has been initiated on all long lead material. The upper and lower PFB Vessel fabrication was started. Quotations for the Substructure Construction (Bid Package No. 1) are under review in preparation for issuing a purchase order in October 1980. Request for quotation on Structural Steelwork have been issued to potential bidders. Groundbreaking ceremonies took place on June 30, 1980 with the Assistant Secretary of the Department of Energy presiding and the Governor of New Jersey, a Congressional delegation and State Commissioner of Energy and Environment, Borough Officials among other dignitaries in attendance. (ERA citation 06:020139)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号