首页> 美国政府科技报告 >Combustion Turbine Combined-Cycle R&D Project Priority Analysis
【24h】

Combustion Turbine Combined-Cycle R&D Project Priority Analysis

机译:燃气轮机联合循环研发项目优先级分析

获取原文

摘要

The development of reliable and cost effective combustion turbine combined cycle systems requires definition and funding of supporting R&D projects. Since time and funds to meet this development goal are limited, a method to prioritize potential R&D projects is highly desirable.nThe purpose of this study was to develop a computerized prioritization methodology for Combustion Turbine R&D projects.nThe methodology includes a Combined Cycle Plant Simulation Model (CCPSM) and a prioritization algorithm that ranks alternatives based on their benefit/cost effectiveness.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号