首页> 美国政府科技报告 >Underground Gasification for Steeply Dipping Coal Beds. Part One. Version D, Process and Hydrology Wells. Rawlins Module No. 2, UCG/SDB Master Drilling and Well Completion Plan
【24h】

Underground Gasification for Steeply Dipping Coal Beds. Part One. Version D, Process and Hydrology Wells. Rawlins Module No. 2, UCG/SDB Master Drilling and Well Completion Plan

机译:急倾斜煤层的地下气化。第一部分。版本D,过程和水文井。罗林斯模块2号,UCG / sDB主钻井完井计划

获取原文

摘要

The Rawlins Test 2, UCG/SDB Master Well Drilling and Well Completion Plan consists of two separate reports. Part 1 consists of the Process Well Drilling and Completion Plan (Version D). This program was accomplished during the Fall 1980 drilling campaign. Four of the HFEM wells described in Part 2 were also drilled during that campaign due to early completion of the process well drilling. General program objectives are stated in this report. Part 2 consists of the Instrument Well Drilling and Completion Plan (Version B). This program is presently being accombplished in the Spring 1981 drilling campaign. Due to many changes in the types, numbers and locations of the instrument wells it was written in a more general fashion to retain flexibility in the plan. The only significant changes to date from the plan are that the four HFEM wells completed during Fall 1980 were completed with 92' of Fiberglass at the bottom instead of the 210' now specified.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号