首页> 美国政府科技报告 >Study of Universal Pressure Boiler for Cycling Operation
【24h】

Study of Universal Pressure Boiler for Cycling Operation

机译:通用压力锅炉循环运行的研究

获取原文

摘要

Babcock & Wilcox, under contract with Electric Power Research Institute, conducted preliminary design studies and a series of cycling field tests on an oil-fired, subcritical once-through boiler designed for base load operation. The field tests indicated what design changes should be made to the plant prior to being used for cyclic operation. Major concerns with the existing plant are thermal shock damage to the boiler, water clean-up, high temperatures in furnace tubes, steam temperatures in furnace tubes, steam temperature control during start-up, and difficulties coupling the cross compound turbine generator fields. Preliminary design studies indicate that for reliable on/off cycling operating, the boiler should be retrofitted with spiral furnace circuitry and an updated bypass system, and the turbine and large motors should be checked for their ability to start and stop a large number of times.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号