首页> 美国政府科技报告 >Base Irradiation History and Interim Inspection of the BWR (Boiling Water Reactor) Test Fuel Rods of Rod Group BK7: The Studsvik Super-Ramp Project
【24h】

Base Irradiation History and Interim Inspection of the BWR (Boiling Water Reactor) Test Fuel Rods of Rod Group BK7: The Studsvik Super-Ramp Project

机译:棒组BK7的BWR(沸水反应堆)测试燃料棒的基础辐照历史和中期检测:studsvik超级斜坡项目

获取原文

摘要

Eight short BWR test fuel rods (rod group BK7) have been supplied by KWU for the Studsvik SUPER-RAMP Project. These fuel rods, assembled with six additional rods to two segmented rods of KWW standard length, were pre-irradiated in the nuclear power plant Wuergassen (Kernkraftwerk Wuergassen = KWW) Germany during four operation cycles from May 1975 to December 1980. After removal from the fuel assembly the rods were taken to the Hot Cells at Karlstein for interim inspection prior to the ramp tests at Studsvik. This report presents the detailed base irradiation history of the rods in KWW as well as the results of the interim inspection at Karlstein. 21 figs., 5 tabs.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号