首页> 美国政府科技报告 >Feasibility Study: A New Cable-Tray Hanger Concept for Nuclear Power Plants. Final Report (PWR; BWR)
【24h】

Feasibility Study: A New Cable-Tray Hanger Concept for Nuclear Power Plants. Final Report (PWR; BWR)

机译:可行性研究:核电站的新型电缆托架吊架概念。最终报告(pWR; BWR)

获取原文

摘要

This study partially assessed the feasibility of using flexible connectors in Class 1E systems to attach cable trays to their stiff hanger systems. Using finite-element, classical analytical, and experimental studies, it was found that a flexible connector with appropriate stiffness and damping characteristics could be used to isolate trays from hanger vibration and significantly reduce hanger loads during seismic events if the connectors could be adequately tuned to account for system variables. Finite-element techniques were used to select a flexible connector for a specified base hanger system. Tests were conducted on one-third-scale models to establish values for some of the parameters and to partially verify the numerical and analytical methods. Calculations were then performed using the dimensions of the base hanger system. (ERA citation 08:031627)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号