Research on Water Proportioning for Dust Control at Longwalls. Phase II Report

机译:长壁防尘配水研究。第二阶段报告

获取原文

摘要

After the Quarto Mining Corporation had offered its cooperation, the face equipment at the South Longwall of Quarto's Powhatan No. 4 mine was studied in detail. It was decided not to increase the water system's capacity. Thus, only modifications on the shearer had to be made. The sharer is an Eickhoff 300. Some modifications had been made to the water distribution system on this machine by the mine. The water distribution, cooling and spray system as we found it is shown in Figure 4. To enable the water proportioning tests, modifications were designed as shown in Figure 5. Valve and gauge assemblies were installed in each of the water supply lines to the drums. In addition, gauges were installed to measure the flow and pressure of the water supplied to the shearer. It was decided to incorporate the existing distribution block in the design and not to change the water supply system to the motor. This could safely be done, because the modifications would not decrease the flow to the motor. Consequently, the modifications could be kept simple. All hardware necessary for the tests at Quarto was procured and the valve systems pre-assembled. A detailed sampling strategy was developed, geared toward the data collection effort at Quarto. (ERA citation 08:013791)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号