首页> 美国政府科技报告 >Energy conservation potential of Portland cement particle size distribution control, Phase 2. (Fourth) quarterly progress report for the period 1 November 1982-31 January 1983.
【24h】

Energy conservation potential of Portland cement particle size distribution control, Phase 2. (Fourth) quarterly progress report for the period 1 November 1982-31 January 1983.

机译:波特兰水泥粒度分布控制的节能潜力,第2阶段。(第四季)1982年11月1日至1983年1月31日期间的季度进度报告。

获取原文

摘要

The main objectives of Phase 2 are to determine the feasibility of using cements with controlled particle size distributions (CPSD cements) in practical concrete applications, and to refine our estimates of the potential energy savings that may ensue from such use. The work in Phase 2 is divided into two main tasks, some parts of which will be carried out simultaneously: Task 1 will continue cement paste studies to optimize cement performance similar to those of Phase 1, but with particular emphasis on gypsum requirements, blended cements, and water-reducing admixtures. This task will also include preparation of sufficient CPSD cements for use in all Phase 2 work. Task 2 will be a comprehensive examination of the properties of concretes made with CPSD cements. This will include optimization of concrete mix designs to obtain the best possible performance for practical applications of both portland and blended cements. The effects of chemical admixtures and curing temperature variations will also be determined.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号