首页> 美国政府科技报告 >Passive Solar Commercial Buildings Project. Project Status Report, January 1-January 31, 1984
【24h】

Passive Solar Commercial Buildings Project. Project Status Report, January 1-January 31, 1984

机译:被动式太阳能商业建筑项目。项目状况报告,1984年1月1日至1月31日

获取原文

摘要

The data from the Security State Bank is ready for BLAST analysis. The TMY data from the test data needs to be placed in BLAST readable format before analysis can continue. A further examination of the infiltration data taken during the site visit has led to some encouraging results. Most of the usable data compares well with air flow predictions made by the Aeolian Kinetics data logger and natural infiltration rates have been obtained. An initial BLAST model of the Johnson Controls building has been created consisting of five thermal zones, three of which are supplied by heating and cooling equipment. Site data taken by the Aeolian Kinetics data logger has been used to develop equipment schedules for the final BLAST model. The building alterations test required to calibrate the BLAST model is currently being performed. This test should be completed and data sent to ESG by the end of February 1984. The task status of computer modeling, daylighting analysis and performance monitoring is reported. (ERA citation 09:030548)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号