Safety Evaluation Report Related to the Restart of Davis-Besse Nuclear Power Station, Unit 1, Following the Event of June 9, 1985, Docket No. 50-346, Toledo Edison Company

机译:1985年6月9日事件发生后,第1单元戴维斯贝斯核电站重启的安全评估报告,托莱多爱迪生公司案卷号50-346

获取原文

摘要

On June 9, 1985, the Davis-Besse Nuclear Power Station experienced a partial loss of main feedwater while at 90% power. Following a reactor trip, other malfunctions and operator errors led to a total loss of feedwater for a short period. Before operators were able to restore feedwater, both steam generators boiled dry. This report presents the staff's evaluation of the corrective actions taken by the licensee to prevent recurrence and to improve overall performance of Davis-Besse with respect to safety. The Safety Evaluation supports the restart of the facility.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号