首页> 美国政府科技报告 >High Temperature Burner-Duct-Recuperator System Evaluation: Second Annual Report, October 1982--September 1983
【24h】

High Temperature Burner-Duct-Recuperator System Evaluation: Second Annual Report, October 1982--September 1983

机译:高温燃烧器 - 管道 - 回热器系统评估:1982年10月 - 1983年9月的第二次年度报告

获取原文

摘要

Activities in the second year of a project to develop a high-temperature burner-duct-recuperator are reported. The recuperator is designed to operate in high temperature flue gas streams that contain contaminants and delivers 2000 F preheat air to the combustion system of a steel mill soaking pit. A prototype recuperator was constructed and evaluated. Analysis thermal and fluid flow, flow induced vibration, stress, and materials test data were obtained. Final recuperator system design modifications were made, based on the prototype results, and system fabrication was initiated. Other activities included the development of a high temperature burner, completion of a preliminary economic analysis, and host site preparation. (ERA citation 13:046743)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号