首页> 美国政府科技报告 >BNFL (British Nuclear Fuels) Sellafield: Post Audit Progress, December 1987
【24h】

BNFL (British Nuclear Fuels) Sellafield: Post Audit Progress, December 1987

机译:BNFL(英国核燃料)塞拉菲尔德:后审计进展,1987年12月

获取原文

摘要

The report of the safety audit at the Sellafield site was published in December 1986. In this, the Health and Safety Executive required British Nuclear Fuels (BNFL) to make improvements to the site and safety cases have had to be produced. These have now to be assessed by the Nuclear Installations Inspectorate. BNFL has undertaken programmes of maintenance, refurbishment and replacement of equipment. Much of this work was done in the shut-down maintenance period in the spring and summer. However, more work is needed to bring plants up a condition suitable for operating for the next ten years. BNFL have also started to decontaminate and decommission disused, contaminated, plants. This will generate a large amount of radioactive waste. BNFL have to build plants to containerise and encapsulate the waste prior to disposal. Waste disposal sites to complete the clean-up process are needed. The improvements to the engineering plants, to written procedures and to training, are reported. Changed attitudes are also noted. (ERA citation 13:029998)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号