首页> 美国政府科技报告 >Initial High-Power Testing of the ATF (Advanced Toroidal Facility) ECH (Electron Cyclotron Heating) System
【24h】

Initial High-Power Testing of the ATF (Advanced Toroidal Facility) ECH (Electron Cyclotron Heating) System

机译:aTF(高级环形设备)ECH(电子回旋加热器)系统的初始高功率测试

获取原文

摘要

The Advanced Toroidal Facility (ATF) is a moderate aspect ratio torsatron that will utilize 53.2 GHz 200 kW Electron Cyclotron Heating (ECH) to produce nearly current-free target plasmas suitable for subsequent heating by strong neutral beam injection. The initial configuration of the ECH system from the gyrotron to ATF consists of an optical arc detector, three bellows, a waveguide mode analyzer, two TiO sub 2 mode absorbers, two 90 sup 0 miter bends, two waveguide pumpouts, an insulating break, a gate valve, and miscellaneous straight waveguide sections feeding a launcher radiating in the TE sub 02 mode. Later, a focusing Vlasov launcher will be added to beam the ECH power to the saddle point in ATF magnetic geometry for optimum power deposition. The ECH system has several unique features; namely, the entire ECH system is evacuated, the ECH system is broadband, forward power is monitored by a newly developed waveguide mode analyzer, phase correcting miter bends will be employed, and the ECH system will be capable of operating short pulse to cw. Initial high-power tests show that the overall system efficiency is 87%. The waveguide mode analyzer shows that the gyrotron mode output consists of 13% TE sub 01 , 82.6% TE sub 02 , 2.5% TE sub 03 , and 1.9% TE sub 04 . 4 refs. (ERA citation 13:005265)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号