首页> 美国政府科技报告 >Manage, Operate, and Maintain the Component Development and Integration Facility in Butte, MT: Quarterly Technical Progress Report, April 1-June 20, 1989.
【24h】

Manage, Operate, and Maintain the Component Development and Integration Facility in Butte, MT: Quarterly Technical Progress Report, April 1-June 20, 1989.

机译:管理,运营和维护组件开发和集成工具,位于蒙大拿州巴特市:季度技术进步报告,1989年4月1日至6月20日。

获取原文

摘要

This quarterly technical progress report presents the tasks accomplished at the Component Development and Integration facility during the third quarter of FY89. Areas of technical progress this quarter included: coal system development; seed system development; test bay modification; channel power dissipation and distribution system development; integrated topping cycle and proof-of-concept current controls project; split coal feed system; coal-fired precombustor; iron core magnet thermal protection system checkout; combustion carbon balance and stack gas analysis; coal-fired combustor support; 1A channels refurbishment; arc observation project; dry materials transfer system controls upgrade; Mississippi State University post-nozzle test section; test operations and results; data enhancement; data analysis and modeling; technical papers; and projected activities. 3 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号