首页> 美国政府科技报告 >Waste Isolation Pilot Plant (WIPP) TRU (Transuranium) Waste Shipment Dry Run Preoperational Checkout Plan.
【24h】

Waste Isolation Pilot Plant (WIPP) TRU (Transuranium) Waste Shipment Dry Run Preoperational Checkout Plan.

机译:废物隔离试验工厂(WIpp)TRU(超铀)废物运输干运行前操作检验计划。

获取原文

摘要

The Waste Isolation Pilot Plant (WIPP) is a major system acquisition authorized as a research and development facility to demonstrate safe disposal of both remote-handled (RH) and contact-handled (CH) transuranic defense waste in bedded salt. In addition to these full-scale demonstrations, WIPP will provide facilities for experimentation with radioactive materials. This plan documents the scope for the preoperational checkout of the shipment of transuranic defense waste from generator/storage (shipper) sites to the WIPP facility. As readiness is a phased effort, portions or all of this plan may be exercised at a given time. It has been prepared in compliance with the WIPP Waste Transportation Manual, WP 06-2. Results from the preoperational checkout establish the basis for a preoperations checkout report to be used for WIPP and generator/storage site operational readiness review activities. A separate preoperational checkout and preoperational checkout report will be performed and prepared for each site upon completion of the demonstration. 4 refs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号