首页> 美国政府科技报告 >Development and testing of a fieldworthy system of improved fluid pumping device and liquid sensor for oil wells. Technical progress report, third quarter 1992
【24h】

Development and testing of a fieldworthy system of improved fluid pumping device and liquid sensor for oil wells. Technical progress report, third quarter 1992

机译:开发和测试用于油井的改进的流体泵送装置和液体传感器的现场系统。技术进步报告,1992年第三季度

获取原文

摘要

An economical gas lift system has been designed that uses the airlift principles of the APOP system to enable one to pump deep wells which have been initially pumped using jack pumps. It can be constructed and installed in oil and/or gas wells where jack pumps have been operating. The 2 in. tubing in the bore hole is left in place and the rods are pulled from the normally 2 in. tubing. A 1 in. or greater diameter tubing containing a one way valve near its bottom and several small holes near the bottom of the 1 in. tube and just above the one way valve is installed into the 2 in. tubing. The one inch tube extends the total length of the 2 in. tubing and is seated on the seating nipple at the bottom of the 2 in. tubing. The space between the concentric tubes can serve as the gas(air) line and the center 1 in. tube serves as the liquid discharge line. This enables this pump to be used in many marginal wells which ordinarily would be uneconomical to pump. This is especially true for deep wells because the cost of jack pumps and the tubing as well as the maintenance to pump liquids from bore holes that are several thousand feet deep is substantial.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号