Analysis of Modification Types in Navy Construction Contracts

机译:海军建设合同修改类型分析

获取原文

摘要

In this report, I analyzed nearly 8400 modifications in over 2200 completed Navy construction contracts from Southern Division of the Naval Facilities Engineering Command to identify the most frequent and expensive categories. Using the modification reason code, the modifications were divided into 20 categories and the effect of each of these categories was determined quantitatively. The data, which I found was not normally distributed, was run three ways: (1) Unadjusted; (2) Adjusted for planned or expected modifications; (3) Adjusted for planned or expected modifications and terminated contracts. The third way is the most representative of a 'typical' contract and the modifications with the largest effect on contract price are: (1) Unforeseen Conditions, 2.65% increase over the total of all contract prices; (2) Design Changes, 1.82% increase; (3) Customer Requested Changes, 1.64% increase. Overall, modifications increased the average contract price by 7.78%, justifying the customary practice of including a 10% contingency in funding estimates. I also report on several problems in the use of modification reason codes that effect the analysis, though not significantly.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号