Process Energy and Pollution Reduction (PEPR) Level I Review at the Watervliet Arsenal, New York

机译:过程能源和污染减少(pEpR)一级审查在纽约Watervliet阿森纳

获取原文

摘要

The U.S. Army Construction Engineering Research Laboratory (CERL) held a Process Optimization (PO) workshop and performed a Level I Process Energy and Pollution Reduction (PEPR) Audit 1-5 February 1999 at the Watervliet Arsenal, NY. The primary objective of the audit was to financially and technically review the Arsenal's manufacturing steps and to identify process changes that will significantly incease performance and efficiencies. A corollary objective was to transfer process optimization techniques to WVA's team to analyze other processes. A significant number of process improvements were identified for the heat treat, plating, and energy systems. The combined value from process changes could potentially improve WVA's operating margins by approximately $5.8 million per year, with a $683K capital investment. Ideas requiring such investment, however, must be developed further, tested, and re- analyzed based on a Level II (in-depth) analysis in which all assumptions are verified. The Level II analysis will generate 'appropriation grade' process improvement projects for submission to top management for funding.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号