首页> 美国政府科技报告 >Finding of No Significant Impact: Construction and Operation of a Septic System to Treat Sanitary Wastewater at New Boston Air Force Station, New Hampshire.
【24h】

Finding of No Significant Impact: Construction and Operation of a Septic System to Treat Sanitary Wastewater at New Boston Air Force Station, New Hampshire.

机译:发现无重大影响:新罕布什尔州新波士顿空军基地处理卫生废水的化粪池系统的建设和运行。

获取原文

摘要

The U.S. Air Force (USAF) proposes to construct and operate a septic system for disposal of sanitary wastewater at New Boston Air Force Station (NBAFS), New Hampshire. The proposed action will eliminate the need for a National Pollutant Discharge Elimination System (NPDES) permit. The proposed action would occur in and adjacent to the Operations Area in the northeast portion of the station. Potential impacts to the natural and human environment associated with construction and operation of the septic system at NBAFS are assessed in the accompanying Environmental Assessment (EA), entitled Environmental Assessment for Construction and Operation of a Septic System at New Boston Air Force Station, New Hampshire. The EA was prepared in accordance with specific tasks and procedures of the USAF Environmental Impact Analysis Process (EIAP; Air Force Instruction 32-7061), as it applies to the National Environmental Policy Act of 1969 (Public Law 91-190, 42 U.S.C. Sections 4321-4347). The EA evaluates the environmental consequences of the proposed action and the no-action alternative (i.e., continuing to use the existing wastewater treatment plant). The assessment evaluates the potential for impacts to air quality, noise levels, topography, geology, soils, water resources, ecological resources (including threatened and endangered species and wetlands), cultural resources, land use, recreation, visual resources, socioeconomics, and health and safety.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号