首页> 美国政府科技报告 >National Dam Inspection Program. Moraine State Park Dam (NDI PA-273), Ohio River Basin, Muddy Creek, Butler County, Pennsylvania. Phase I Inspection Report.
【24h】

National Dam Inspection Program. Moraine State Park Dam (NDI PA-273), Ohio River Basin, Muddy Creek, Butler County, Pennsylvania. Phase I Inspection Report.

机译:国家大坝检查计划。冰碛州立公园大坝(NDI pa-273),俄亥俄河流域,muddy Creek,巴特勒县,宾夕法尼亚州。第一阶段检查报告。

获取原文

摘要

Moraine State Park Dam is a zoned earthfill embankment approximately 1,933 feet long, including a 60-foot concrete ogee spillway section, with a maximum height of 55 feet. The facility is serviced with an uncontrolled ogee-crested concrete spillway discharging into a concrete stilling basin 60 feet wide and 52 feet long. In addition, the facility is equipped with an outlet works located through the concrete ogee spillway which consists of a 72-inch sluice gate and a 12-inch bypass pipe for downstream low flow augmentation without operating the sluice gate. Operation of the sluice gate and bypass piping and access to the Outlet Chamber is from the control building situated on the crest of the embankment and adjacent to the east side of the spillway.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号