首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Merimere Reservoir Dam (CT 00252), Mattabasset River Basin, Meriden/Berlin, Connecticut. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Merimere Reservoir Dam (CT 00252), Mattabasset River Basin, Meriden/Berlin, Connecticut. Phase I Inspection Report

机译:国家非联邦大坝检查计划。梅里梅尔水库大坝(CT 00252),马塔巴塞特河流域,梅里登/柏林,康涅狄格州。第一阶段检查报告

获取原文

摘要

The Merimere Reservoir Dam is an earth dam that is approximately 690 feet long and 30 feet high. It also has an emergency spillway. Based on visual inspection, records available at the site and past operational performance, the dam is judged to be in poor condition. A review of the limited engineering data available reveals that there are areas of concern. The downstream side of the dam shows signs of fairly heavy seepage and as a result, it is felt that this condition should be investigated further. The project spillway will pass only 12 percent of the estimated Probable Maximum Flood (PMF), the recommended spillway test flood. Therefore, further hydrologic and hydraulic studies are recommended to refine the test flood, determine the ability of the dam to withstand overtopping, and, if appropriate, recommend measures to increase the hydraulic capacity of the spillway.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号