首页> 美国政府科技报告 >National Dam Safety Program. Bethany New City Reservoir Dam (MO 10071), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report
【24h】

National Dam Safety Program. Bethany New City Reservoir Dam (MO 10071), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report

机译:国家大坝安全计划。伯大尼新城水库大坝(mO 10071),密苏里州 - 大 - Chariton盆地,哈里森县,密苏里州。第一阶段检查报告

获取原文

摘要

Bethany New City Reservoir Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the spillway does meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. Additional deficiencies, in accordance with the guidelines, are the lack of seepage and stability analysis. These analyses should be obtained in the future. Other deficiencies visually observed by the inspection team were small trees and brush growing on the upstream embankment slope, some trees growing in the spillway channel and erosion of the spillway channel downstream from the sill.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号