首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Babbidge Reservoir Dam (NH 00398), NHWRB 206.03, Connecticut River Basin, Roxbury, New Hampshire. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Babbidge Reservoir Dam (NH 00398), NHWRB 206.03, Connecticut River Basin, Roxbury, New Hampshire. Phase I Inspection Report

机译:国家非联邦大坝检查计划。巴比比水库大坝(NH 00398),NHWRB 206.03,康涅狄格河流域,罗克斯伯里,新罕布什尔州。第一阶段检查报告

获取原文

摘要

The Babbidge Reservoir Dam is a 38-foot-high earth embankment with a reinforced concrete corewall. There is a 36-foot-long concrete overflow spillway at the left abutment and a gatehouse at the crest which controls flow from the reservoir and from the Quarry Dam upstream. It is small in size with a high hazard potential. Significant economic loss and possible loss of more than a few lives could result from the event of a dam failure. With stoplogs, the spillway is capable of passing 9% of the test flood. The dam is in fair condition. Remedial measures should be undertaken by the owner.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号