首页> 美国政府科技报告 >Tug Fork River Big Bend Cutoff Blast Monitoring Study.
【24h】

Tug Fork River Big Bend Cutoff Blast Monitoring Study.

机译:Tug Fork River Big Bend Cutoff Blast监测研究。

获取原文

摘要

This report documents the results of a blast vibriation monitoring program conducted in the vicinity of the proposed Tug Fork River Big Bend Cutoff. Explosive and traffic (railroad and highway) induced vibration data were measured at selected sites in the vicinity of the proposed excavation. Analysis of these data shows that the railroad induced maximum peak particle velocities are one-tenth or less (= or < 0.2 in./sec) than the damage threshold for structures ( 2 in./sec) and one-fortieth or less than the damage threshold for unlined tunnels (8in./sec). Dominant frequencies of the recorded data are in the range 30 to 50 hz. This frequency range dictates a minimum delay time of 30 msec.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号