首页> 美国政府科技报告 >Puget Sound Dredged Disposal Analysis (PSDDA). Management Plan Report (MPR), Unconfined, Open-Water Disposal of Dredged Material. Phase 1 (Central Puget Sound)
【24h】

Puget Sound Dredged Disposal Analysis (PSDDA). Management Plan Report (MPR), Unconfined, Open-Water Disposal of Dredged Material. Phase 1 (Central Puget Sound)

机译:普吉特海湾疏浚处置分析(psDDa)。管理计划报告(mpR),无限制,开放式疏浚物资处置。第1阶段(普吉特中央声音)

获取原文

摘要

This final environmental impact statement evaluates alternatives considered in identifying preferred sites for disposal of dredged material in Central Puget Sound. Three public multiuser disposal sites (Commencement Bay, Elliott Bay, and Port Gardner) are identified for use based on a site selection process which considered several alternative sites. Alternative biological effects conditions for site management have been considered and a site condition identified for purpose of dredged material at the Phase I sites. (edc)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号