首页> 美国政府科技报告 >Marine Ecological Risk Assessment at Naval Construction Battalion Center,Davisville, Rhode Island. Phase 1
【24h】

Marine Ecological Risk Assessment at Naval Construction Battalion Center,Davisville, Rhode Island. Phase 1

机译:罗德岛戴维斯维尔海军建筑营中心的海洋生态风险评估。阶段1

获取原文

摘要

The Naval Construction Battalion Center (NCBC) in Davisville, Rhode Island, hasbeen the subject of a joint ecological research program by the Navy and Environmental Protection Agency. Allen Harbor, a small embayment of Narragansett Bay adjacent to NCBC, was used to develop research and monitoring methods for ecological risk assessment. Two sites on the National Priorities List were of particular concern: (1) a 15-acre landfill used from 1946 to 1972 for the disposal of such wastes as solvents, PCB-contaminated oils, preservatives, sewage sludge, chromic acid, and construction rubble; and (2) a cement-lined pit that from 1960 to 1974 was the depository of calcium hypochlorite, chloride, and decontaminating solution. Phase I of the study characterizes the ecology, natural resources, sediment, and water quality. A preliminary ecological risk assessment is developed. Exposure to and the effects of contamination are measured at both subtidal and intertidal stations. A T-shaped transect of stations projecting from the mouth of the harbor into Narragansett Bay proper is established to determine if measurable levels of contaminants and effects are reaching the Bay. A series of mid-Narragansett Bay stations provide a reference for comparing effects within Allen Harbor.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号