首页> 美国政府科技报告 >Environmental Assessment: Lockport Approach Dike, Stage 2 Repairs, Will County,Illinois
【24h】

Environmental Assessment: Lockport Approach Dike, Stage 2 Repairs, Will County,Illinois

机译:环境评估:Lockport approach Dike,第二阶段维修,威尔县,伊利诺伊州

获取原文

摘要

Fort he past 20 top 30 years, the Lockport approach dike has experienced seepagefrom the Chicago Sanitary and Ship Canal to the Des Plaines River. Repairs have been made, but a subsidence occurred in May 1990 with two subsequent events, the most recent in November 1990. In the interest of safety and integrity of project operation, the U.S. Army Corps of Engineers is finalizing emergency repairs to stop the subsidence problems. These emergency repairs are considered Stage 1 of a project to raise the safety level of the approach dike. Stage 2 repairs, although not considered to be emergency in nature, are needed to maintain the dike's safety and operation. The dike is experiencing ongoing erosion to its canal side due to canal level fluctuations and tow prop wash at the various water levels.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号