首页> 美国政府科技报告 >Part I: Pilot Test Work Plan for SWMU Number 70 - Oil/Water Separator No. 326, Cannon AFB, New Mexico. Part II: Interim Pilot Test Results Report for SWMU Number 70 - Oil/Water Separator No. 326, Cannon AFB, New Mexico
【24h】

Part I: Pilot Test Work Plan for SWMU Number 70 - Oil/Water Separator No. 326, Cannon AFB, New Mexico. Part II: Interim Pilot Test Results Report for SWMU Number 70 - Oil/Water Separator No. 326, Cannon AFB, New Mexico

机译:第一部分:sWmU 70号试验测试工作计划 - 新墨西哥州坎农空军基地第326号油水分离器。第二部分:sWmU第70号临时试点测试结果报告 - 油气/水分离器第326号,新墨西哥州坎农空军基地

获取原文

摘要

This work plan presents the scope of multiphase bioventing pilot tests for in situ treatment of fuel-contaminated soils at solid waste management unit (SWMU) Number 70 - Oil/Water Separator No. 326 at Cannon Air Force Base (AFB), New Mexico. The location of the sites with respect to the base is shown on Figure 1.1. The pilot test will be performed by Engineering-Science, Inc. (ES). The three primary objectives of the proposed pilot test are: (1) to assess the potential for supplying oxygen throughout the contaminated soil interval, (2) to determine the rate at which indigenous microorganisms will degrade fuel when supplied with oxygen-rich soil gas, and (3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated to concentrations below regulatory standards.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号