...
首页> 外文期刊>Canadian Journal of Civil Engineering >Improved genetic algorithm for resource-constrained scheduling of large projects
【24h】

Improved genetic algorithm for resource-constrained scheduling of large projects

机译:大型项目资源受限调度的改进遗传算法

获取原文
获取原文并翻译 | 示例
           

摘要

The generalized model of the resource-constrained project scheduling problem (RCPSP) is valuable because it can be incorporated into the advanced computational methods of commercial project management software for practical applications. A construction schedule generated by most commercial project management programs does not guarantee its optimality when the resources are limited. This paper presents an improved elitist genetic algorithm (GA) for resource-constrained scheduling of large projects. The proposed algorithm allocates multiple renewable resources to activities of a single large-sized project to achieve the objective of minimizing the project duration. A permutation-based decoding procedure is developed using the improved parallel schedule generation scheme. A new parameter, named transformation power, is created in the transformation method of the improved algorithm to ensure that the individual selection process performs correctly. Extensive computational results using a standard set of large-sized multiple resource-constrained project scheduling problems are presented to demonstrate the performance and accuracy of the algorithm.
机译:资源受限的项目计划问题(RCPSP)的通用模型很有价值,因为它可以结合到实际应用中的商业项目管理软件的高级计算方法中。当资源有限时,大多数商业项目管理程序生成的施工进度表不能保证其最优性。本文提出了一种改进的精英遗传算法(GA),用于大型项目的资源受限调度。所提出的算法将多个可再生资源分配给单个大型项目的活动,以实现最小化项目工期的目的。使用改进的并行调度表生成方案,开发了基于置换的解码过程。在改进算法的变换方法中创建了一个新参数,称为变换功率,以确保单个选择过程正确执行。提出了使用一组标准的大型多资源受限项目调度问题的大量计算结果,以证明该算法的性能和准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号