The second jetty at the liquefied natural gas (LNG) terminal in Zeebrugge was commissioned in late December following operational tests carried out over recent months. Now the Coral Energy became the first LNG carrier to berth at the jetty for a commercial loading. The second jetty at the LNG terminal has been designed for receiving small LNG carriers with a capacity of 2,000 m~3 up to large LNG vessels with a capacity of 217,000 m~3. Some 200 loadings have already been booked at the second jetty for small LNG carriers under long-term contracts. The 15,000 m~3 Coral Energy supplies mainly small terminals in other regional markets.
展开▼