...
首页> 外文期刊>E&P daily >Visund South plans firmed up
【24h】

Visund South plans firmed up

机译:

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Statoil has confirmed plans to develop its Visund South field as a subsea tieback to the Gullfaks C platform. Visund South, which consists of the Pan and Pandora discoveries, is located 10km from both Gullfaks C and the Visund A platform, and the development will consist of a subsea template with four well slots, where three wells will be drilled and tied in to Gullfaks C for processing. The total cost of the development is expected to be US $962m.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号