首页> 外文期刊>Building >Erinaceous 'overpaid' on Medway contract
【24h】

Erinaceous 'overpaid' on Medway contract

机译:Erinaceous 'overpaid' on Medway contract

获取原文
获取原文并翻译 | 示例
       

摘要

Failed property consultant Erinaceous was systematically overpaid for work carried out on a four-year housing maintenance contract in Kent, an investigation into alleged fraud has found. An internal report by Medway council concludes that there was "no evidence of fraud or dishonesty" by the council or Erinaceous Property Management. However, it reveals that Erinaceous was overpaid for work including repairs and capital works during 2007/08. The report says the council will withhold payments to redress some of the sums lost on the £4.4m a year contract, including an estimated £168,930 relating to the installation of kitchens. However, it concludes that it will not be able to claim back £155,000 lost on roofs and boilers.

著录项

  • 来源
    《Building》 |2008年第25期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2024-01-29 17:12:11
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号