首页> 外文期刊>International journal of surface mining, reclamation and environment >Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX
【24h】

Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX

机译:Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX

获取原文
       

摘要

Short-term production scheduling is the operational basis for mine production over time spans of days, weeks and months. Short-term schedules concentrate on making long-term mine plans operationally feasible and ensuring a steady flow of product for both meeting gross production targets and blending ore. Mathematical programming techniques have been applied to optimize short- and long-term production schedules, but widespread application of these techniques has been limited by the use of routines that are opaque to the end user or difficult to implement. Several examples are provided to illustrate the advantages of using the math modeling language AMPL in conjunction with Techbase, a popular mine modeling package. The strengths of MIP methods as applied to production scheduling are discussed, as are techniques for coping with the limitations of these algorithms.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号