首页> 外文期刊>Oil & Gas Gazette >Deerslayer test disappoints
【24h】

Deerslayer test disappoints

机译:Deerslayer test disappoints

获取原文
获取原文并翻译 | 示例
           

摘要

Strike Energy's highly anticipated Steindorf-1 (30 working interest) test of the Deerslayer prospect has successfully flared gas to surface but at a non-commercial rate. The operator is continuing to evaluate the significant results from the four gas-baring horizons intersected before deciding whether to extend testing or to plug and abandon the well.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号