Construction projects delivered using an off-site solution are frequently described as being of better quality than traditional schemes. But, bearing in mind that quality control standard BSEN 9001: 2001 only ensures that the output of the factory is consistent, not necessarily better, how does the specifier ensure they are getting a higher quality product?
展开▼