【24h】

Five projects make Severn shortlist

机译:五个项目入围 Severn

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

THE POSSIBILITY of a ten-mile barrage across the River Severn to generate up to 5 per cent of the UK's electricity has moved a step closer after it was included on a government shortlist of five schemes for harnessing tidal power in the estuary. Two schemes for innovative tidal lagoons on the English and Welsh coasts and two smaller barrages are also shortlisted. The tides in the Severn estuary are the second highest in the world. Over the past year, a feasibility study has investigated ten options, assessing the costs, benefits and environmental challenges of using the estuary to generate power.
机译:横跨塞文河的10英里长的拦河坝产生高达5%的英国电力的可能性在被列入政府利用河口潮汐能的五个计划的候选名单后,已经更近了一步。英格兰和威尔士海岸的两个创新潮汐泻湖方案和两个较小的拦河坝也入围。塞文河口的潮汐是世界第二高的。在过去的一年里,一项可行性研究调查了十种方案,评估了利用河口发电的成本、收益和环境挑战。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号