首页> 外文期刊>Nuclear Technology: A journal of the American Nuclear Society >Feasibility studies of a soluble boron-free 900-MW(electric) PWR, safety systems: consequences of the partial or total elimination of soluble boron on plant safety and plant systems architecture
【24h】

Feasibility studies of a soluble boron-free 900-MW(electric) PWR, safety systems: consequences of the partial or total elimination of soluble boron on plant safety and plant systems architecture

机译:Feasibility studies of a soluble boron-free 900-MW(electric) PWR, safety systems: consequences of the partial or total elimination of soluble boron on plant safety and plant systems architecture

获取原文
获取原文并翻译 | 示例
       

摘要

A consistent study was conducted on the total or partial elimination of soluble boron within the framework of the French Commissariat a l'Energie Atomique/Nuclear Reactor Directorate/Innovation Program. Three options were considered including, maintaining the soluble boron during cold shutdown, soluble boron only for accident conditions, and total elimination of soluble boron. This article discusses the approach used to identify the motivations that guided the studies on soluble boron reduction or elimination, as well as the initial results.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号