【24h】

Project FOAMY

机译:Project FOAMY

获取原文
获取原文并翻译 | 示例
       

摘要

The last episode of Project Foamy concluded with George in a very flat, but hinged state. With the aileron and elevator hinging completed, and the foam milling diet finished, it is time to move onto construction of the sub-assemblies and the addition of carbon fiber bracing. The next step is the addition of the bottom half of the fuselage, with all wing bracing spars ("V" bracing) and carbon truss members between the bottom half of the fuselage and fuselage crutch. Landing gear legs and stabilizer bracing are also added at this time. This is the most critical part of building the foamy, as the vast majority of the strength of the foamy is developed during this step, and any misalignments that occur in this step will be nearly impossible to remove without destroying the model.

著录项

  • 来源
    《Flying models》 |2011年第846期|58-59|共2页
  • 作者

    dave lockhart;

  • 作者单位

    C/O FLYING MODELS,PO Box 700,Newton,New Jersey 07860;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号