PARAMETRIC TESTS ON UNREINFORCED STEEL MOMENT CONNECTIONS

机译:非钢筋弯矩连接的参数测试

获取原文
获取原文并翻译 | 示例

摘要

Fully restrained steel moment connections have been designed following a codified design procedure. This design was invalidated by brittle connection fractures discovered after the 1994 Northridge earthquake. A new, widely accepted earthquake-resistant design has not been developed to date. This paper presents a summary of the test results on a post-Northridge steel moment connection design proposed by the SAC Joint Venture. The SAC post-Northridge connection design is a conventional unreinforced welded flange/bolted web connection made using notch-tough weld metal and improved welding practices. This connection achieves a mean plastic rotation of 1.5 percent radian, averaged over a wide range of connection parameters. The results of these tests show that weld fracture mitigation measures are beneficial, but are not sufficient to produce a connection design that satisfies the plastic rotation requirements for steel moment-resisting frames in regions of high seismicity. A new, earthquake-resistant connection design should be based on a combination of weld fracture mitigation measures and changes of connection configuration aimed at reducing the stress levels or redirecting the stress flow in the connection.
机译:完全约束的钢力矩连接是按照成文的设计程序设计的。该设计因 1994 年北岭地震后发现的脆性连接断裂而失效。迄今为止,尚未开发出一种新的、被广泛接受的抗震设计。本文总结了SAC合资企业提出的后北岭钢力矩连接设计的测试结果。SAC 后 Northridge 连接设计是一种传统的无增强焊接法兰/螺栓腹板连接,使用坚韧的缺口焊接金属和改进的焊接实践制成。这种连接实现了 1.5% 弧度的平均塑性旋转,在很宽的连接参数范围内取平均值。这些测试结果表明,缓解焊缝断裂的措施是有益的,但不足以产生满足高地震区域钢制抗弯矩框架塑性旋转要求的连接设计。新的抗震连接设计应基于焊接断裂缓解措施和连接配置的改变,旨在降低应力水平或重定向连接中的应力流。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号